This text is replaced by the Flash content.
Edwards DR Directory

Resources

Survival Tips

En Español

Did You Know That...


1948 years ago in AD 63 an earthquake in southern Italy by the gulf of Naples seriously damaged the ancient city of Pompeii causing an undetermined number of deaths and spread out destruction, but the locals went to work rebuilding in the same spot until they were buried by the eruption of the Vesuvius volcano 16 years later in AD 79.



Galveston TX Hurricanes

Average Brushed or hit every 2.94 years
Average Direct hit every 8.63 years

The Great Storm of 1900 - Sep 8th 1900 - Pop: 42,000 residents
Category 4 @ 135 mph -Great loss of life between 6,000 and 12,000 individuals – officially 8,000

The 1915 Storm, August 17th, Category 4 @ 135 mph
42    people dead in the Galveston area
$60 - 1915 million dollars in damage

Ike Sep 13th 2008 - The third most destructive hurricane to ever make landfall in the United States
Final landfall in Galveston Texas as a strong cat 2 with cat 5 equivalent storm surge winds extended 120 miles from the center.

Blamed for at least 195 deaths – 74 in Haiti and 112 in the USA 300 still missing. - Damages estimated at 24 billion (2008) US Dollars

Resulted in the largest evacuation in the state of Texas history and the largest search and rescue operation in US history


Nuclear Issues

Chernobyl, An Experiment Gone Wrong

On Saturday, April 26th, 1986 at 1:23 am, one of the reactors at the Chernobyl nuclear power plant exploded.
Ironically, the experiment consisted in testing how the power plant would respond in the event of an accident. The operators at the plant wanted to bring down the power output of the reactor to 25%, but over-confidence, poor training and poor knowledge of how a reactor works caused them to overdo it, and they ended up bringing down the power output to 1%. When they then tried to bring it up to 25%, the reactor overheated and exploded causing the worst nuclear accident in history.

Five U.S. nuclear reactors in earthquake zones
usatoday.com


Status of the Nuclear Reactors at the Fukushima Daiichi Power Plant
NYTimes.com


How a Reactor Shuts Down and What Happens in a Meltdown
NYTimes.com


Hazards of Storing Spent Fuel
NYTimes.com


Timeline: Nuclear Plant Accidents
BBCNews.com


Why the Fukushima disaster is worse than Chernobyl
independent.co.uk


In graphics: Fukushima nuclear alert
bbc.co.uk


Fukushima victims: homeless, desperate & angry
reuters.com


Japan Panel: Fukushima nuclear disaster "man-made"
bbc.co.uk.com






More, Did You Know That


Downloads


File Formats Help:
File Formats Frequently Used on the Survival Insights Portal



Products - Services





Business Continuity: May 2009 Tip of the Month
Posted on Tuesday, May 12 @ 10:41:13 PDT by editor
May Tip: “Don’t overemphasize the risk assessment process to the detriment of a risk’s response plan.”

With the spread of influenza A H1N1, or swine flu, your organization has probably activated Stage 2 or 3 of its pandemic plan. According to officials, the virus is known to be mutating and could become resistant to drugs.

As of May 6, 2009, 22 countries have officially reported more than 1,500 cases of the infection. Mexico has reported 800+ laboratory confirmed human cases, including 29 deaths. The United States has reported 403 confirmed human cases, spread throughout more than 30 states — some likely in your own backyard.

However, despite media hype, we don’t think anyone should overreact. So far, only two people have died in the U.S. Infected persons have gotten better by themselves, or have responded to antiviral drugs.

Organizations are confronted with numerous threats every day — some avoidable and some not (a pandemic) — yet some planners get caught in the web of risk analysis and never move on to the response plan.

Certainly working through a risk/threat vulnerability assessment process is invaluable. It will help determine and weigh the probability of threats that may impact your organization. Conversely, it will bring to light which risks you have most impact on—either to mitigate or to lessen the likelihood of their occurrence.

While it is true that risks must be identified, some planners get so caught up in the minutia of assessing that risk that they don’t complete their response plans. No one can eliminate all the risks that can cause a disaster — power outages, natural disasters, and, of course, pandemics.

Our recommendation is: For risk/threat incidences that cannot be avoided, plan for the result of them and not the risk/threat incident itself.

After spending valuable time identifying risks/threats, including their probabilities, consequences, mitigation strategies, resulting implementation costs, we recommend spending an equal or greater amount of time on the response plan, e.g., health crisis response plan, business continuity plan, disaster recovery plan, etc.

In planning for the result risk/threat incidences, we recommend conducting an assessment that identifies risk, researches the potential loss impact — both quantitative (financial) and qualitative (operational) — of disruptive events, and weigh those consequences with the cost of remediation.

In the case of swine flu, researchers might look at: how prevalent the disease is in the region, how easily it appears to be contracted, how long the incubation and quarantine period is — both for those exposed to it or actually contracted it — until they could function normally again and wouldn’t expose others, or simply what employee downtime would cost.

However, in planning for the results of widespread pandemic, companies should be able to answer the question on what they would do and how they would operate if they experienced upwards of 50% absenteeism. Allowing staff to work at home, cross train personnel, or hire contractual employees are only a small portion of the answers.

In the overall scheme, once planners have facts in front of them, they should no longer be entangled in the trap of the likelihood of a risk they have no control over anyway. They should weigh risks/threats and plan accordingly for their consequences.


TAMP Systems
Consulting and Software for
Business Continuity and Disaster Recovery Planning
www.tampsystems.com

 
Related Links
· More about
· News by editor


Most read story about :
May 2009 Tip of the Month


Article Rating
Average Score: 2.74
Votes: 27


Please take a second and vote for this article:

Excellent
Very Good
Good
Regular
Bad


Options

Associated Topics

Business Continuity PlanningEmergency ManagementHuman Concerns

Home  ::  Search  ::  Feedback  ::  Top 10  ::  Contact Us
SurvivalInsights.com © 2007 • Privacy PolicyTerms Of Use